Opportunity Information
Funding Information
Award Information
Submission Information
Eligibility Information
Additional Information
Award Administration Information
Criteria
All GIGO applications shall be reviewed for technical merit, cost effectiveness, and adherence to the competitive grant evaluation criteria described in this NOFO. Applications shall undergo a comprehensive, merit-based review against the following criteria:
- Justification of Project Need (0 – 30 points):
- How far is the proposed project upstream or downstream of riverine or localized flooding?
- Highest score to projects with 100 % of project site(s) within or directly adjacent to riverine or localized flooding.
- Lower score to projects with 50 % project site(s) more than 1,000 linear feet from riverine or localized flooding.
- Lowest score to projects with 50 % project site(s) more than 3,000 linear feet from riverine or localized flooding.
- How large is the area impacted by riverine or localized flooding?
- Highest score to applications that document riverine or localized flood area, more than 12” deep and greater than 10 acres in size.
- Lower score to applications that document riverine or localized flood area, more than 4” deep and greater than 3 acres in size.
- What percent of the flood impacted area is serviced by storm sewers?
- Highest score to applications that document flood areas with 100% storm sewer system coverage.
- Lower score to applications that document flood areas with 50% storm sewer system coverage.
- How far is the proposed project upstream or downstream of a river, stream or lake?
- Highest score to projects with 100 % of project site(s) within or directly adjacent to river, stream, or lake.
- Lower score to projects with 50% project site(s), with storm sewer system coverage, more than 1,000 linear feet from river, stream, or lake.
- Lower score to projects with 50% project site(s), with storm sewer system coverage, more than 3,000 linear feet from river, stream, or lake, with storm sewer system coverage.
- Lowest score to applications with project site(s), without storm sewer system coverage, more than 1,000 linear feet from river, stream, or lake.
- How many additional gallons of stormwater will the BMPs retain/detain?
- This will be compared to all other applications.
- How long (in days) is the BMP designed to detain the captured stormwater?
- Highest score to the applications that document the best time to replenish the capacity to detain stormwater while providing a water quality benefit – this could include projects where some BMPs drain more quickly and their capacity to detain water is available sooner than another BMP with a slower draw down.
- Lower score to applications with BMPs that take longer to replenish the capacity to detain stormwater.
- Lowest score to applications that do not replenish BMPs ability to detain stormwater on a recurring basis.
- Are the project BMPs methodologies and location appropriate for addressing and reducing flooding and/or problems resulting from stormwater runoff?
- Highest score for projects where 100% of the BMPs and their locations are most appropriate to meet the mission of the GIGO NOFO.
- Lower score for projects where less than 100% of the BMPs and/or their location is most appropriate to meet the mission of the GIGO NOFO.
- Lower score for projects where an appropriate type of BMP is proposed, but a project location has not yet been determined.
- What percent of the proposed project BMPs will reconnect the river, stream, or lake to its floodplain?
- Highest score for projects where 100% of the BMPs are designed to reconnect the river, stream, or lake to its floodplain.
- Lower score for projects where less than 100% of the BMPs are designed to reconnect the river, stream, or lake to its floodplain.
- Lowest score for projects that do not reconnect the river, stream, or lake to its floodplain.
- Likelihood of Project Success (0 – 20 points)
- How many BMPs will be implemented?
- Highest score for single project or single treatment train.
- Lower score for 2 – 5 projects or treatment trains.
- Lowest score for more than 6 projects.
- What percent of project site landowners have confirmed permission to implement the project?
- Highest score to a project owned 100% by applicant.
- Lower score for project with multiple landowners that HAVE submitted written confirmation from ALL landowners that they plan to participate.
- Lower scores for those projects that have partial landowner confirmation.
- Lowest score for projects without documentation of landowner to participate.
- What percent of project design(s) is complete?
- Highest score for project with PE stamped designs 100% complete.
- Lower score to those with 60 – 90% designs completed.
- Lower score to applications with only a conceptual design.
- Lowest score to applications that only can provide a narrative of the proposed project.
- What percent of required local, State, and federal permits have been secured?
- Highest score to a project which has secured all required permits.
- Lower score to a project that has some, but not all required permits.
- Lower score to project that has submitted applications for all required permits.
- Lowest score to projects that can identify what is needed but have not submitted permit application(s).
- What percent of the project can be completed within 24 months?
- Highest score to a project which can be completed in less than 24 months
- Lower scores to projects which can be completed in under 30 months.
- Budget/Cost-effectiveness (0 – 20 points)
- What percent of project budget is eligible?
- Highest score for application with 100% eligible project costs.
- Lower score for application with less than 100% eligible costs.
- What percent of the budget line items are properly justified in the AmpliFund project budget narrative?
- Highest score for relevant explanation of 100% of project costs, including an engineer’s estimate of costs.
- Lower score for partial explanation of less than 100% of project costs, including an engineer’s estimate of costs.
- Lower score for minimal explanation of project costs, including engineer’s estimate of costs.
- Lowest score for partial explanation of less than 100% of project costs.
- What percent of the eligible match is secure?
- Highest score to projects that document 100 % of required match is ‘available immediately’.
- Lower score to projects that document that required match is ‘pledged’.
- Lowest score to projects that document that required match is ‘applied for’.
- What is the project’s BMP cost/unit?
- This will be compared to all other applications.
- What is the project’s cost of gallon of stormwater captured?
- This will be compared to all other applications.
- How much are the BMP design costs?
- Highest score to projects that do not have design costs in the project budget.
- Lower score to projects that are less than $25,000 or 7.5% of the BMP implementation cost, earmarked for design.
- Lowest score to projects that have $50,000, or 15% of the BMP implementation cost, earmarked for design.
- Sustainability (0 – 10 points)
- What percent of the BMPs have a designed lifespan greater than 10 years?
- Highest score for projects that include 100% of BMPs with lifespan greater than 25 years.
- Lower score for projects that include 50% of BMPs with lifespan greater than 25 years. The percent would be determined not by the number of BMPs, but by their ability to reduce stormwater runoff.
- Lowest score for projects that do not exceed the required 10-years of O&M.
- Does the applicant propose a relevant and robust operation and maintenance (O&M) plan, including funds to implement said plan and identification of the entity responsible to implement the O&M plan?
- Highest score to application that outlines the O&M activities necessary for the proposed BMP, source of funding, and responsible entity that has a secured capacity to conduct the required work.
- Lower score for projects that provide brief description of required O&M activities, source of funds, and responsible entity.
- Lowest score for minimal detail on activities, funding source, and responsible entity.
- Infrastructure Plan Integration (0 – 10 points)
- Does the application document a local effort to coordinate green infrastructure planning with other infrastructure planning such as local ordinances or other BMP implementation efforts?
- Highest score goes to application that documents that the GIGO BMP is part of a larger layered effort (ordinances, planning, BMP implementation) to reduce stormwater runoff for flood reduction.
- Lower score for applications that link the project to other BMP implementation
- Lowest score for applications that document the GIGO project as the only work happening within their jurisdiction.
- Environmental Justice (0 – 10 points)
What percent of the flooded area to be protected by project is located within an Environmental Justice area?
- Highest score goes to applications where 100% of the flood reduction is realized within an Environmental Justice area.
- Lower score goes to applications where 50% of the flood reduction is realized within an Environmental Justice area.
- Lowest score goes to applications where 25% of the flood reduction is realized within an Environmental Justice area.
Review and Selection Process
The complete applications shall be reviewed by an Evaluation Panel that is composed of Illinois EPA staff.
Application scores shall be calculated as follows:
- Applications will be ranked based on the sum of the scoring criteria.
- Applications will be ranked highest to lowest based on total project score.
- Applications with the highest scores will be considered for an award.
Additional review and selection processes are provided below.
- If the amount of available grant funding is not sufficient to fund a higher-ranked application in its entirety, the Illinois EPA shall review the application to determine if a discrete portion or phase of the project meeting the mission of this NOFO can be funded. If the Evaluation Panel determines that it cannot fund the application in full or part, the next highest-ranked application will be reviewed for a discrete portion or phase to be funded to meet the mission of the NOFO or the funds may not be awarded and may be made available through a subsequent NOFO.
- If the Illinois EPA determines that an applicant incorrectly calculated or indicated the project cost, match, and/or total funding request based on the applicable cost estimate, required match, or eligible costs, the application shall still be accepted and reviewed. If the applicant is awarded a grant, the Illinois EPA shall contact the applicant and request a decision from the applicant as to whether it will accept the award based on the Illinois EPA’s determination of the project cost, applicant match, and/or total funding requested. If the applicant does not accept the Illinois EPA’s determination, the application shall not be funded.
Appeal Process
An appeal process is available to applicants and other interested parties, however, appeals are limited to the Illinois EPA evaluation process. Evaluation scores may not be protested. An appeal must be submitted in writing to the following address: Illinois EPA, Attn: GIGO, Bureau of Water, Mail Code #15, P.O. Box 19276, Springfield, Illinois 62794-9276 and must be received within 14 calendar days after the date that the grant award notice has been published by the Illinois EPA on Grants.Illinois.gov. The written appeal shall include, at a minimum, the following: the name and address of the appealing party, identification of the grant, and a statement of reasons for the appeal. Illinois EPA shall acknowledge receipt of an appeal within fourteen (14) calendar days from the date the appeal was received.
When an appeal is received, the execution of all remaining grant agreements that Illinois EPA intends to make under this NOFO shall be stayed until the appeal is resolved, unless the Illinois EPA determines the needs of the State require moving forward with execution of the remaining grant agreements. The State need determination and rational shall be documented in writing.
Illinois EPA shall respond to the appeal within 60 days or supply a written explanation to the appealing party as to why additional time is required. The appealing party must supply any additional information requested by Illinois EPA within the time period set in the request. The Director of the Illinois EPA may appoint one or more Appeal Review Officers (ARO) to consider the grant-related appeal and make a recommendation to the Director of the Illinois EPA or designee for resolution. The ARO shall make a recommendation to the Director of the Illinois EPA or designee as expeditiously as possible after receiving all relevant, requested information. In determining the appropriate recommendation, the ARO shall consider the integrity of the competitive grant process and the impact of the recommendation on the Illinois EPA. The Illinois EPA shall resolve the appeal by means of written determination, which shall include, but not be limited to: review of the appeal, appeal determination, and rationale for the determination.
Anticipated Announcement Dates
| Action by Illinois EPA | Target Dates |
| Notify unsuccessful applicants that their application was not selected for funding. | January 15, 2025 |
| Notify selected applicants of potential award | February 15, 2025 |
| Send a Grant Agreement to the selected applicant for signature. | June 30, 2025 |
| Provide a fully executed Grant Agreement to the grantee. | August 30, 2025 |
Following a decision of intent to award, the Illinois EPA is required by GATA to conduct a programmatic risk assessment of the applicant. The applicant is required to complete a fiscal and administrative risk assessment. Additional information may be required at that time from the successful applicant. To remain eligible for the award, the applicant must provide the requested information within the time specified by the Illinois EPA. The Fiscal and Administrative Risk Assessment Questionnaire is available on the GATA Portal. Illinois EPA will conduct the Programmatic Risk Assessment evaluating the applicant's ability to carry out the terms of GIGO.