Opportunity Information
Funding Information
Award Information
Submission Information
Question Submission Information
Eligibility Information
Additional Information
Award Administration Information
Criteria
Content and Form of Application Submission
An application under this NOFO must include:
• Illinois EPA EV Charging Application (to be uploaded in Amplifund)
• IL444-5205 Grantee Conflict of Interest Disclosure (to be uploaded in Amplifund)
• Executed Site Host Agreement or a Signed Memorandum of Understanding, if applicable (to be uploaded in Amplifund)
• Uniform Grant Application (completed as a form in Amplifund)
• Uniform Grant Budget Template (completed as a form in Amplifund)
An application must be complete. It must include all of the information that is requested in this NOFO. The application must be submitted by a person authorized to sign on the behalf of the applicant.
Incomplete applications will be denied.
Eligible Charging Station and Charging Station Location Requirements
An application requires a minimum of two locations. A location is a site with one or more charging ports at the same address.
Illinois EPA recommends but does not require combining all locations into a single application. If an applicant submits multiple eligible applications, each application will be scored and ranked independently. If more than one of the applications are funded, Illinois EPA may combine the awards into a single Grant Agreement.
Due to the first-come, first-served nature of this NOFO, a location in an application must have a minimum score of 50 for the location to be funded. Locations not meeting the minimum score of 50 will not be funded. Applicants must have a minimum of two locations in their application that meet the minimum score to be funded. The scoring process is quantitative and does not involve any qualitative processes at IEPA. It is recommended that applicants compute the score of their locations before applying to ensure they meet the minimum score of 50.
No applicant will be awarded more than $5 Million in state funding in this Round 3.
In addition to meeting the minimum score, all projects funded under this NOFO must meet the following equipment, installation, and operation requirements:
• If applying for only DCFC level 3 chargers at a location, an applicant shall submit an application for at least four DCFC charging ports at each location. This NOFO will fund up to eight DCFC ports per location.
• If applying for only level 2 chargers at a location, an applicant shall submit an application for at least six level 2 charging ports at each location. This NOFO does not place a cap on the number of level 2 charging ports it will fund per location.
• For an application that includes both types of chargers at a location, the application must meet the same minimum requirements of four DCFC ports and six level 2 ports at a location. The same maximums apply as well, i.e., this NOFO will fund up to eight DCFC ports per location and there is no maximum number of level 2 charging ports this NOFO will fund per location.
• An applicant may apply for a combination of sites that includes only level 3 chargers, only level 2 chargers, or both types of chargers at various locations, as long as the application meets all NOFO requirements.
• This NOFO does not limit the number of chargers that an applicant may install at a location, but it does limit the number of chargers that this NOFO will fund at a location.
• This NOFO does not limit the number of applications per applicant. However, an applicant shall not include the same charging station location in multiple applications.
• If two or more applicants apply for the same location, Illinois EPA will notify the applicants and the applicants shall work together to determine under which application the location shall proceed.
• Additional points and funding will be awarded to projects in an area identified as an Equity Investment Eligible Community (EIEC) through the EIEC mapping tool at this link: https://arcg.is/1Wvv4X. Locations qualifying for the EIEC points and funding shall be in either an EJ community and/or a restore, reinvest, and renew (R3) community as defined by the mapping tool at that link. The blue shading is EJ communities, and the orange shading is R3 communities.
• Additional points will be awarded to projects located at public transportation park-and-ride facilities. These must be facilities that allow riders to park at the facility while riding public transportation operated by a public agency.
• Additional points will be awarded to locations that propose to install chargers that provide more than the minimum power per charging port. This is based on charging one vehicle per charger, so for level 3 chargers, more than 100 kW, and for level 2 chargers, more than 6.2 kW.
• Additional points will be awarded to locations in the 52 counties where no projects were awarded in Rounds 1 or 2 of this program. If projects were awarded in a county but all projects have dropped out ahead of development of this Notice of Funding Opportunity, projects in that county are eligible for these additional points. For this Notice of Funding Opportunity, the eligible counties are: Alexander, Bond, Brown, Calhoun, Carroll, Cass, Christian, Clay, Clinton, Crawford, Cumberland, Dewitt, Edgar, Edwards, Ford, Franklin, Fulton, Gallatin, Greene, Hamilton, Hardin, Henderson, Jasper, Jersey, Jo Daviess, Lawrence, Livingston, Marshall, Macoupin, McDonough, Menard, Mercer, Monroe, Morgan, Moultrie, Perry, Piatt, Pike, Pope, Pulaski, Putnam, Randolph, Richland, Saline, Schuyler, Scott, Shelby, Stark, Wabash, Warren, Washington, and Wayne.
• This NOFO is targeting areas where there is a lack of any type of public charging stations; therefore, any proposed location shall not have any pre-existing public chargers of the same type (Level 2 or Level 3) that the applicant is requesting funding for at a specific location.
• The charging stations must be new, commercial-grade equipment.
• The charging stations must be publicly accessible for five years from charger energization. For purposes of this NOFO, “publicly accessible” means available to any member of the public 24 hours a day, 7 days a week without access restrictions. For the purpose of this NOFO, requiring a payment to park at a location (e.g., a parking garage) is not an “access restriction.”
• Each charging station location must have signage that complies with all applicable federal, state, and local laws, ordinances, regulations, and standards and provides a toll-free number to call for assistance; Electric vehicle charging signs are required near the charging station along with electric vehicle only stenciled graphics (e.g., “EV Parking Only”) on each striped parking space reserved for electric vehicle charging.
• Each charging station must be located at a charging station location that is either owned by the applicant or for which there is or will be a host agreement with the applicant to host the charging station at the charging station location for a minimum of five years after the initial in-service date of the charging station. A Site Host Agreement for a charging station location must be for a term of at least five years starting with the initial applicant’s legal right to own and operate the charging station(s) at the host site; must identify responsible parties for hosting, operating, and maintaining the charging station and charging station location; and must contain a disposition plan for the charging station in the event the agreement is terminated. For an applicant that is not the owner of a proposed charging station location, the applicant must submit an executed Site Host Agreement or a signed memorandum of understanding stipulating the location owner supports the application and commits to negotiate a Site Host Agreement if the application is funded.
• For DCFC level 3 chargers, each charging station location must consist of a minimum of four ports that can charge using the Combined Charging System (CCS) or the North American Charging Standard (NACS), capable of simultaneously charging four electric vehicles. The ports can be any combination of CCS and/or NACS. All awarded applicants shall be required to maintain the CCS and/or NACS connectors funded through this program throughout the life of the charger. There is no restriction on the number of ports per charger. Each DCFC port must be capable of providing at least 100 kW of power while charging one vehicle per charger and be capable of providing at least 50 kW of power when simultaneously charging two or more vehicles on the same charger.
• For level 2 chargers, each charging station location must consist of a minimum of six SAE J1772 ports, capable of simultaneously charging six electric vehicles. All awarded applicants shall be required to maintain the SAE J1772 compatibility of all ports funded through this program throughout the life of the charger. There is no restriction on the number of ports per charger. Each level 2 port must be capable of providing at least 6.2 kW of power per port when charging one vehicle per charger. Each level 2 charger must be Energy Star certified.
• For level 3 chargers, each unit must be enclosed and must be constructed for use outdoors in accordance with UL 50E Standard for Safety for Enclosures for Electrical Equipment, Environmental Considerations, Type 3R exterior enclosure or equivalent.
• Each charging station unit must incorporate a cord management system or method to eliminate potential cable entanglement, user injury, or port damage from lying on the ground.
• Charging station installation must be performed in accordance with industry standards and best practices and comply with all applicable federal, state, and local requirements, including Illinois Commerce Commission registration and certification requirements which apply to the installers of electric vehicle charging stations as well as those conducting maintenance and repair.
• Each charging station unit must be certified and meet relevant technical and/or safety standards, including but not limited to, all applicable federal, state, and local building, electrical, and safety codes (i.e., International Building Code, National Electrical Code), applicable Underwriters Laboratories (UL) certifications, Federal Communications Commission requirements (47 CFR 15 – Radio Frequency Devices), and must also have valid certification(s) from a Nationally Recognized Testing Laboratory (NRTL).
• Each charging station unit must be capable of operating over an ambient temperature range of 0 to 122 degrees Fahrenheit with a relative humidity of up to 95%.
• Charging station locations and charging stations must be Americans with Disabilities Act of 1990 (ADA) compliant.
• Each charging station must have and be connected to an operating network and must have the ability to switch between Open Charge Point Interface (OCPI) networks.
• Each charging station must follow network “roaming” best practices established by the OCPI protocol.
• Each charging station must be Open Charge Point Protocol (OCPP) compliant for communications between charging stations and operating networks.
• For each charging station, the network system must proactively monitor charging stations for maintenance needs and notify/dispatch for corrective action as issues are identified.
• Each charging station must support continuous operations even when network connectivity is not available or consumer cell phone service is not available (i.e., “default on” with loss of network).
• Charging stations may require payment from users. Where payment is required:
• The charging station shall provide multiple payment options for drivers for both pay-per-use and subscription methods, including options such as credit and debit cards, smart cards, and smart phone applications.
• All payment equipment must possess the capabilities to ensure credit card transactions are compliant with the latest PCI and PA-DSS standards.
• All payment equipment must employ commercially reasonable security standards to protect sensitive and/or confidential data.
• All payment equipment shall display real-time pricing and fee information on the unit, payment screen, or associated phone application.
• Each charging station must be accessible to “walk up” consumers (meaning that drivers must be able to initiate a charge session without a prior membership or network interaction).
• Each charging station must record charging data including percentage of operational uptime, the number of charging events, average charge time per vehicle in minutes, average kWh per charge, and total overall kWh delivered. This data must be maintained for a minimum of five years beyond the recording of the data. This data must be made available to the Illinois EPA upon request. This data must also be reported to the Illinois EPA as otherwise provided in this NOFO or in any grant agreement issued as a result of this NOFO.
• Each charging station, including the operating network system, must continually be in full-working order. Each charging station shall be maintained in accordance with the manufacturer recommendations and warranty coverage requirements. Scheduled and unscheduled maintenance and repair must be completed and the charging station fully operational within 72 hours to ensure 95% annual uptime.
• Each charging station must have a minimum three-year warranty.
• Each charging station location must have lighting from dusk to dawn to ensure ease of use of the charging station and to ensure security.
• Each charging station location must have at a minimum, the same number of reserved electric vehicle parking spaces as the number of charging ports at the charging station. At least one of the parking spaces must meet ADA requirements but does not need to be ADA reserved.
• Parking spaces must meet state and local design codes and have paved asphalt or concrete as their base.
• Each charging station must have collision protection such as: bollards, wheel stops, curb protection, or wall-mounted barriers.
• Each charging station location must have electric service appropriate for the size and type of charging station(s) set forth in the application.
• Grantees shall publish information about all funded and online charging station locations on the website PlugShare (https://www.plugshare.com/) and the U.S. Department of Energy’s Alternative Fuels Data Center website (https://afdc.energy.gov/fuels/electricity-locations#/analyze?fuel=ELEC®ion=US-IL).
The Illinois EPA is required by GATA to conduct a financial and administrative risk assessment of the applicant. Additional information may be required at that time from the successful applicant. For the applicant to remain eligible for an award, it must provide the requested information within the timeframe specified by the Illinois EPA. The Programmatic Risk Assessment (as determined by applicant’s Internal Controls Questionnaire in the GATA Grantee Portal) evaluates the applicant’s ability to successfully carry out the terms of a specific program and assesses four risk categories:
• quality of management systems and ability to meet the management standards,
• history of performance,
• reports and findings from audits performed on prior awards, and
• the applicant’s ability to effectively implement statutory, regulatory, or other requirements imposed on awardees.
The awards will have special terms and conditions in addition to the general terms and conditions of the Uniform Grant Agreement.
Award Information and Cost Sharing or Matching
The award amounts and mandatory cost share requirements are as follows:
• Each application shall have a minimum of two charging station locations.
• Each DCFC-only charging station location shall have a minimum of four DCFC ports. The reimbursement for each DCFC charger will be 80% of total eligible costs, up to a maximum award of $40,000 per port.* Additional funding is available for locations in Equity Investment Eligible Communities. Additional information about that funding is below.
• Each level 2-only charging station location shall have a minimum of six level 2 ports. The reimbursement for each level 2 port will be 80% of total eligible costs, up to a maximum award of $4,000 per port.* Additional funding is available for locations in Equity Investment Eligible Communities. Additional information about that funding is below.
• For an application that includes both types of chargers at a location, the application must meet the same minimum requirements of four DCFC ports and six level 2 ports at a location. In this situation, the same maximums apply as well, i.e., this NOFO will fund up to eight DCFC ports per location and there is no cap on the number of level 2 charging ports this NOFO will fund per location. The award amounts are still capped at $40,000 per DCFC port and $4,000 per level 2 port for sites where DCFC ports and level 2 ports are both installed.
• *For charging locations in Equity Investment Eligible Communities, Level 3 charging ports can receive $2,500 extra per charging port and Level 2 charging ports can receive $500 extra per charging port. The 80/20 match requirement still applies at these higher levels.
Nothing in this NOFO shall limit the number of charging ports at a charging station location. However, the maximum award amounts are set forth above.
Grant awards are a reimbursement that occurs only after execution of a grant agreement between the Illinois EPA and a grantee. The reimbursement occurs after all charging ports at a location are installed and operational. Partial reimbursement can occur after the first location is fully operational.
The number and amounts of awards will be dependent on the number of applications received and levels of funding requested. The Illinois EPA may offer partial awards depending on funding availability. No applicant will be awarded more than $5 Million in state funding in this Round 3.
The Illinois EPA may choose to not deny applications for funding until all funding has been expended from this NOFO and may proceed to award the next eligible application if funding becomes available. A message will be posted on the program website notifying applicants that all current funding has been assigned but will continue to accept applications until all funding has been expended.
Review and Selection Process
Complete and eligible applications will be reviewed and selected on a first-come, first-serve basis until funding is depleted.
Potential applicants may address any problems with accessing the application by contacting EPA.EVCharging@illinois.gov.
Application Review Information
The administrative completeness review assesses whether the requirements in this NOFO, as further addressed in the application forms for this NOFO, have been met. The requirements are summarily restated below. If in reviewing the application, any requirements are not met as required in this NOFO or the related forms, the application will be denied. No points will be assigned for the administrative completeness.
Application was complete with the information requested:
Application included an Illinois EPA EV Charging Application (uploaded in Amplifund)
Application included a Grantee Conflict of Interest Disclosure (uploaded in Amplifund).
Application included a Uniform Grant Application (completed as form in Amplifund).
Application included a Uniform Grant Budget Template (completed as form in Amplifund).
The proposed charging stations will be located in Illinois.
There are no existing public charging stations of the same type (Level 2 or Level 3) at the proposed charging station locations.
The charging stations will be new, commercial-grade equipment.
The charging stations and charging station locations will be publicly accessible 24/7 for five years from the energization of the last charging port at a location.
Applicant is the owner of the proposed charging station locations or has uploaded in Amplifund a qualifying Site Host Agreement or Memorandum of Understanding noting the property owner support of the application and a good faith commitment to negotiating a Site Host Agreement.
Each location with DCFC ports will have a minimum of four CCS and/or NACS ports capable of simultaneously charging four electric vehicles.
Each location with level 2 ports will have a minimum of six SAE J1772 ports capable of simultaneously charging six electric vehicles.
Each DCFC port will be capable of providing at least 100 kW of power while charging one vehicle per charger and be capable of providing at least 50 kW of power while charging more than one vehicle per charger, as applicable.
Each level 2 port will be capable of providing at least 6.2 kW of power per port when charging one vehicle per charger.
As applicable, each charging station enclosure will be constructed for use outdoors in accordance with applicable UL standards for Safety for Enclosures for Electrical Equipment, Environmental Considerations, Type 3R exterior enclosure or equivalent.
Each charging station will incorporate a cord management system or method to eliminate potential for cable entanglement, user injury, or port damage from lying on the ground.
Charging station installation will comply with all applicable federal, state, and local requirements, including Illinois Commerce Commission registration and certification requirements.
Charging stations will be certified and meet relevant technical and/or safety standards, including but not limited to, all applicable federal, state, and local building, electrical, and safety codes (i.e., International Building Code, National Electrical Code), Underwriters Laboratories (UL) Standards for Electric Vehicle Charging System Equipment, Federal Communications Commission requirements (47 CFR 15 – Radio Frequency Devices), and must also have valid certification(s) from a Nationally Recognized Testing Laboratory (NRTL).
Charging stations will be capable of operating over an ambient temperature range of 0 to 122 degrees Fahrenheit with a relative humidity of up to 95%.
Charging station locations and charging stations will be Americans with Disabilities Act of 1990 (ADA) compliant.
Each charging station will be connected to an operating network and will have the ability to switch between Open Charge Point Interface (OCPI) networks.
Each charging station will follow network “roaming” best practices established by the OCPI protocol.
Each charging station will be Open Charge Point Protocol (OCPP) compliant for communications between charging stations and operating networks.
The operating network system will proactively monitor charging stations for maintenance needs and notify/dispatch for corrective action as issues are identified.
Each charging station will support continuous operations even when network connectivity is not available or consumer cell phone service is not available (i.e., “default on” with loss of network).
If payment is required, the payment and security requirements will be satisfied.
Each charging station will be accessible to “walk up” consumers, meaning that drivers must be able to initiate a charge session without a prior membership or network interaction in a simple, straightforward process.
Each charging station will be able to provide charging data including percentage of operational uptime, the number of charging events, average charge time per vehicle in minutes, average kWh per charge, and total overall kWh delivered.
Each charging station, including the operating network system, must continually be in full-working order and shall be maintained in accordance with the manufacturer recommendations and warranty coverage requirements; and scheduled and unscheduled maintenance and repair will be completed and the station, including the operating network system, fully operational within 72 hours to ensure 95% annual uptime.
Each charging station will have a minimum three-year warranty.
Each charging station will provide lighting for potential drivers from dusk to dawn for both ease of use and security.
Each charging station location will have ample parking space and provide, at a minimum, the same number of reserved electric vehicle parking spaces as the number of ports at the charging station. The charging station location will have at least one parking space that meets ADA requirements for handicap accessibility, but not necessarily ADA reserved.
At each charging station location, parking spaces will meet state and local design codes and have paved asphalt or concrete as their base.
Each charging station will have collision protection.
Each charging station location will have electric service appropriate for the size and type of charging station(s) set forth in the application.
Each charging station location will have signage that complies with all applicable federal, state, and local laws, ordinances, regulations, and standards; Electric vehicle charging signs are required near the charging station along with electric vehicle only stenciled graphics (e.g., “EV Parking Only”) on each striped parking space reserved for electric vehicle charging.
Each charging station will be located at a charging station location that is either owned by the applicant or for which the applicant submitted a host agreement (or Memorandum of Understanding supporting the application and committing to negotiate a Site Host Agreement if the application is funded) with the applicant to host the charging station on the charging station location for a minimum of five years after the initial in-service date of the charging station. A Site Host Agreement for a charging station location must be for a term of at least five years starting with the initial in-service date of the charging station(s); must contain a provision regarding the applicant’s legal right to own and operate the charging station(s) at the host site; must identify responsible parties for hosting, operating, and maintaining the charging station and charging station location; and must contain a disposition plan for the charging station in the event the agreement is terminated.
GATA Administrative Completeness (must be able to answer yes to these):
Not currently debarred by the State of Illinois and/or federal government
Not on the Federal Excluded Parties List
Have a valid UEI number
Have a current, active SAM.gov account or have started applying for one
In good standing with the Illinois Secretary of State
Not on the Illinois Stop Payment List
Not on the Dept. of Healthcare and Family Services Provider Sanctions List
Completed an Internal Controls Questionnaire (“ICQ”) as the Fiscal and
Administrative Risk Assessment for the latest fiscal year – FY26
Not on the SAM.gov exclusion list
Unique Entity ID (UEI) and System for Award Management (SAM) -- Each applicant (unless the applicant is an individual or Federal or State awarding agency that is exempt from the requirements under 2 CFR §25.110(b) or (c), or has an exception approved by the Federal or State awarding agency under 2 CFR § 25.110 (d)) is required to:
• Begin their registration in SAM before submitting their application. To establish a SAM registration, go to www.SAM.gov and/or utilize this instructional link: How to Register in SAM from the www.grants.illinois.gov Resource Links tab. Entities registering in SAM must submit a notarized letter appointing their authorized Entity Administrator.
• Provide a valid UEI number in their application; and
• Continue to maintain an active SAM registration with current information at all times during which it has an active Federal, Federal pass-through or State award or an application or plan under consideration by a Federal or State awarding agency. It also must state that the State awarding agency may not make a Federal pass-through or State award to an applicant until the applicant has complied with all applicable SAM requirements and, if an applicant has not fully complied with the requirements by the time the State awarding agency is ready to make a Federal pass- through or State award, the State awarding agency may determine that the applicant is not qualified to receive a Federal pass-through or State award and use that determination as a basis for making a Federal pass-through or State award to another applicant.
Scoring Process
All applications will be reviewed by Illinois EPA staff for administrative completeness and, if deemed administratively complete, scored against criteria identified in this NOFO, in compliance with relevant GATA and 2 CFR 200 Uniform Requirements.
Each individual charging station location (minimum of two) within a single application will be scored individually. All locations must meet a minimum score of 50 to be funded. The minimum score applies per location, not per application.
An application must have at least two locations that meet the 50 point minimum to be funded.
1. Equity Investment Eligible Communities
25 points for each charging station location in an area identified as an Equity Investment Eligible Community through the EIEC mapping tool at https://arcg.is/1Wvv4X. To qualify for these EIEC points, a charging station location shall be in either an EJ community (blue shading), an R3 community (orange shading), or both.
2. Distance to Nearest Public EV Charging Site
How many miles, as driven, from each proposed charging station location to the closest public EV Charging site (not including dealerships or singular chargers such as Tesla Supercharger sites)?
Note: there is not a distinction of level of charger here; this is asking for the closest public charger of any type. The AFDC site can help find current chargers in an area: https://bit.ly/4974UCf.
• Greater than 10 miles: 25 points for each location
• 6 to 10 miles: 15 points for each location
• 1 to 5 miles: 5 points for each location
• Less than 1 mile: 0 Points for each location
3. Access to Amenities
How many miles as driven, from each charging station location to primary amenities (e.g., public restrooms, indoor public seating, restaurants or fast food, convenience stores, other retail, etc.):
• Onsite: 20 points for each location
• Less than ½ mile: 15 points for each location
• Between ½ mile to 1 mile: 5 points for each location
• Greater than 1 mile: 0 points for each location
4. Public Transportation Park-And-Ride Facility
15 points for each charging station location for which the primary use is for people to park while riding public transportation operated by a public agency.
5. Greater than Minimum Specified Power Levels:
5 points for each charging station location that proposes to install chargers that provide more than the minimum number of kW per charging port.
6A. Project Readiness
What is the status of securing a charging station for each charging station location?
• Completed: 5 points for each location
• In Process: 3 points for each location
• Not Started: 0 points for each location
6B. What is the status of construction/installation of the charging station for each charging station location?
• Completed: 5 points for each location
• In Process: 3 points for each location
• Not Started: 0 points for each location
6C. What is the estimated project completion timeline of the charging stations for each proposed charging station location?
• Completed: 5 points for each location
• In Process: 3 points for each location
• Not Started: 0 points for each location
7. Location In Previously Unfunded County
25 points for each charging station location in one of the following counties:
Alexander, Bond, Brown, Calhoun, Carroll, Cass, Christian, Clay, Clinton, Crawford, Cumberland, Dewitt, Edgar, Edwards, Ford, Franklin, Fulton, Gallatin, Greene, Hamilton, Hardin, Henderson, Jasper, Jersey, Jo Daviess, Lawrence, Livingston, Marshall, Macoupin, McDonough, Menard, Mercer, Monroe, Morgan, Moultrie, Perry, Piatt, Pike, Pope, Pulaski, Putnam, Randolph, Richland, Saline, Schuyler, Scott, Shelby, Stark, Wabash, Warren, Washington, or Wayne.
Agency Review and Error Correction
If the Illinois EPA determines that an applicant incorrectly calculated or indicated the project cost, applicant cost-share, and/or total funding request based on the applicable cost estimate, required cost shares, or eligible costs, and the Agency can correct the error, that error will not adversely affect completeness. If the applicant is awarded a grant, the Agency will contact the applicant and request a decision from the applicant as to whether it will accept the award based on the Agency’s determination of the project cost, applicant cost-share, and/or total funding requested.
Any eligible applicants not funded in Round 1 or Round 2 may re-apply in this funding round.
Illinois EPA staff will be responsible for evaluating applications.
Anticipated Announcement Dates
Anticipated Project Timeline:
Within 60 days of receiving the grant application, applicants will be notified of a funding decision.
Within 120 days of notification of selection for funding, Illinois EPA expects to send a grant agreement to the grant recipient for signature.
Within 90 days of sending a grant agreement to the grant recipient for signature, Illinois EPA expects to provide a fully executed grant agreement to the grant recipient.