Illinois Finance Authority (IFA), in its capacity as the Illinois Climate Bank (CB), invites project proposals under Illinois’ award for the 40101(d) Federal Formula Grant Program: Preventing Outages and Enhancing the Resilience of the Electric Grid (Program). With this NOFO, IFA/CB invites eligible entities interested in applying for funding under this Program to file their pre-application proposals in compliance with the terms of this NOFO.
IFA/CB reserves the right to revise any part of this NOFO by issuing addendum(s) at any time. Issuance of this NOFO, or subsequent addendum(s), if any, does not constitute a commitment by IFA/CB or the State of Illinois to fund any project. In addition, IFA/CB may cancel this NOFO at any time, without incurring any liability from responders or potential responders.
Illinois 40101(d) Overall Objectives: In September 2023, Illinois was announced as one of the recipients of an award in the first award cycle of the Grid Resilience State and Tribal Formula Grants Program under the Bipartisan Infrastructure Law. The U.S. Department of Energy (US DOE) awarded $24,549,822 to the State of Illinois for the first three years (FY2022, 2023 and 2024) of the five-year Program.
The award is designed to strengthen and modernize Illinois’ power grid and to provide a reliable power infrastructure to all communities to have access to affordable, reliable, and clean electricity, focusing on the following:
• Reliability and resiliency improvements in Equity Investment Eligible Communities (EIECs) that align with potential climate change impacts.
• Grid investments that support environmental objectives such as reducing emissions and leveraging nature-based solutions.
• Cost-saving measures that prioritize low- and moderate-income residents to lower their energy burden.
• Supporting equity through building awareness in frontline communities, increasing access and opportunities for residents and businesses in EIECs, and supporting communities and small utilities in planning and investing in resiliency.
• Ensuring safe operations and supporting the preparation of the workforce for emerging technology opportunities.
State Objecties: Under the administration of the IFA/CB, Illinois will hold a competitive selection process to identify projects for which the federal funding will be deployed to improve grid resiliency to disruptive events pursuant to Section 40101(d). IFA/CB will select projects that support five core state objectives: Resilience, Environment, Equity, Affordability, Safety and Workforce. The set of metrics and strategies described below will be used to effectively track whether investments achieve State goals.
Illinois’ investment decisions in selecting projects under this Program are guided by the “Climate and Equitable Jobs Act” (CEJA) and the stakeholder input received in the process of developing application for this funding opportunity. CEJA establishes and addresses several Illinois energy policy goals and prioritizes investments.
To determine the objectives and metrics, criteria, and methods for this Program, the IFA/CB gathered stakeholder feedback in Winter and Spring 2023 through a stakeholder engagement process that engaged more than 120 different entities, including community-based organizations, local governments, utilities, advocacy organizations, organized labor, consumer advocates, business groups, and minority contractors. The IFA/CB worked with stakeholders to first identify state resiliency, environmental, affordability, equity, safety, and workforce goals from CEJA and other state policies, then establish core objectives and metrics for near-term action. Based on the objectives identified, the IFA/CB worked with stakeholders to develop criteria for project selection to identify projects most likely to meet the objectives. These objectives were further developed in line with the Illinois State Energy Office’s State Energy Security Plan (SESP) that addresses potential hazards to each energy sector or system, including physical and cyber threats/vulnerabilities.
IFA/CB will assess the effectiveness of objectives highlighted here, through the Program implementation. Specifically, the State will assess whether the objectives established under this Program have resulted in projects that generate the greatest community benefit in reducing the likelihood and consequences of disruptive events and will assess that such benefit is accurately reflected by collected metrics.
1.1. RESILIENCE
Objective: improved reliability and resiliency in EIECs, and on improving community resilience for those least able to respond to disruptions.
Intended Outcomes: Reduced frequency, duration, and impact of outages for Illinois most vulnerable residents, businesses, and critical services:
1. Reduced frequency and duration of outages in EIECs.
2. Improved community resilience for those least able to respond to disruptions.
3. Aligned resilience planning with future climate risks.
Metrics: The IFA/CB will work with grant recipients and participating utilities to track resilience objectives through the following metrics, identifying impacts specifically for EIECs:
1. System Average Interruption Duration Index (“SAIDI”): during a calendar year for the census tracts impacted by the investment measured against a baseline SAIDI for the census tract, as well as the SAIDI for the utility service area as a whole.
2. System Average Interruption Frequency Index (“SAIFI”) during a calendar year for the census tracts impacted by the investment measured against a baseline SAIFI for the census tract, as well as the SAIFI for the utility service area as a whole.
3. Customers Experiencing Long Interruption Durations (CELID) during a calendar year for the census tracts impacted by the investment measured against a baseline average CELID for the census tract, as well as the CELID for the utility service area as a whole.
4. Customers Experiencing Multiple Interruptions (CEMI) during a calendar year for the census tracts impacted by the investment measured against a baseline average CEMI for the census tract, as well as the CEMI for the utility service area as a whole.
These metrics will be measured using the same measurement methodology as the utility performance metrics adopted by the Illinois Commerce Commission and authorized under CEJA. The IFA/CB will work with the Illinois utilities to obtain resiliency metric data at a census tract level, to identify the impact of the Program on Illinois’ EIECs. IFA/CB will work with smaller utilities to collect similar information if they lack the ability to collect the data at a census tract level.
1.2. ENVIRONMENT
Objective: Ensure grid resilience investments support and do not detract from CEJA’s environmental objectives and allow for the improved integration of distributed energy resources on the grid to provide additional resiliency benefits.
Intended Outcomes: Reduced greenhouse gas emissions, pollutants impacting public health, fuel costs, and energy burden in Illinois (particularly in disadvantaged communities):
1. Enhanced environmental quality and public health by reduced emissions of GhG, NOx, SOx, and PM.
2. Increased rate of installation and integration of renewable energy resources.
3. Leveraged nature-based solutions and native tree planting.
Metrics: Benefits will be tracked, to the extent practicable, by census tract to allow for data aggregation by EIECs in the following categories:
• Metric tons of GHG emissions reduced by project investments.
• Metric tons of NOx, SOx, PM reduced by project investments.
• Megawatts (“MW”) of renewable energy capacity added to the Illinois electric grid as a result of the project.
• Megawatts (“MW”) of energy storage capacity installed on the Illinois electric grid.
• Reduction in peak energy load periods in MW per calendar year for the applicable Regional Transmission Organization service areas due to demand side management actions undertaken from the project.
IFA/CB will work with funding recipients and participating utilities to track emissions reductions and renewable energy integration data for these metrics related to their projects.
1.3. EQUITY
Objective: bring the benefits of grid modernization and clean energy, including, deployment of distributed energy resources, to all retail customers, and support efforts to bring at least 40% of those benefits to EIECs.
Intended Outcomes:
1. Increased access and opportunities for residents and businesses in EIECs.
2. Increased diverse contractor/subcontractor participation in professional services, subcontracting, and prime contracting opportunities.
3. Aligned demographics of contractors/subcontractors to the demographics of the state.
4. Increased awareness and trust in the energy system in frontline communities.
5. Support communities and small utilities that lack the capacity to plan for and invest in resiliency.
The State of Illinois will leverage the new designations of Equity Eligible Persons and Equity Eligible Contractors, as well as create linkages to persons that have participated or are participating in CEJA workforce and contractor programs.
Metrics: The IFA/CB will work with grant recipients and participating utilities to gain estimates and impacts on the extent to which the project is achieving its goals through the following metrics:
1. Total project dollar value and percentage of grant funds spent to benefit EIECs.
2. Number, dollar value and percentage of total diversity-certified spending in a calendar year for the project.
3. Number, dollar value and percentage of total spending on Equity Eligible Contractors / Persons in a calendar year for the project.
4. Number of new Equity Eligible Contractors < 1 yr old participating on a project.
1.4. AFFORDABILITY
Objective: Affordability of electric delivery services for all customers, including low-income customers and prioritize cost-savings measures for low- and moderate-income residents to help lower their energy burden.
Intended Outcomes: Reduced energy bills and energy burden for EIECs:
1. Reduced energy burden for low- and moderate-income residents.
2. Ensure low- and moderate-income and disadvantaged communities are not left behind in the clean energy transition.
3. Support communities in making long-term affordable energy decisions.
4. Reduced costs for public entities that pass-through costs to taxpayers & users.
Metrics: The IFA/CB will work with grant recipients and participating utilities to gain estimates and impacts on the affordability of the energy system through the following metrics:
1. Reduction in energy burden for participating or impacted customers, measured as a total energy cost as a percentage of income.
2. Reduction in long-term costs to electric utility or impacted customers over the life of the investments.
3. Reduction in public costs to utilities and public agencies for outage response and recovery, based on projections of outage operational and capital investment needs.
1.5. SAFETY AND WORKFORCE
Objective: Have a well-trained workforce to ensure safe operation of the energy system; maintain and grow a diverse workforce, diverse supplier procurement base and diverse approved-vendor pools, including increased opportunities for minority-owned, female-owned, veteran-owned, and disability-owned business enterprises; consider health & safety challenges in existing buildings that impact the ability of residents of EIECs to both withstand the shocks and stresses of climate-related extreme weather events and to make the necessary investments to overcome them.
Intended Outcomes:
1. Ensure the safe operation of the energy system.
2. Prepare the workforce for emerging technology opportunities.
3. Address health & safety challenges in existing buildings that impact resilience.
Metrics: The IFA/CB will work with grant recipients and participating utilities to track workforce, training, and safety objectives through the following metrics:
1. Jobs created, based on a Full-time equivalent for the period of project performance.
2. Number of graduates of training programs participating in projects.
3. Number of homes and residents, supported through residential resiliency investments.
4. Reduction in # of wires down events, compared to a baseline, for an electric utility in the project area.