Application Submission Information
Application Content
Submit your application though the Grantee Portal at https://il.amplifund.com/Public/Opportunities/Details/ec132b81-4589-4aae-a872-9d87bee465d5. To submit your application, please provide the following in accordance with the instructions provided below:
1. Uniform State Grant Application (accessible through the Grantee Portal);
2. Applicant’s information (accessible through the Grantee Portal);
3. Project Narrative;
4. Attachment A - Metrics, Timelines and Milestones (available at the IFA/CB IL40101d website);
5. Budget and Budget Justification spreadsheet (template available at the IFA/CB IL40101d website);
6. Vendor Quotes;
7. Cost Commitment Letter (template available at the at the IFA/CB IL40101d website);
8. Environmental Questioner (NEPA) (template available at the at the IFA/CB IL40101d website); and
9. Applicant’s Certifications (accessible through the Grantee Portal).
1.1. Uniform State Grant Application
Please fill out this section in the Grantee Portal and provide the following:
1. Lead applicant’s legal name, common name, EIN, UEI, and GATA ID.
2. Lead applicant’s department name.
3. Applicant’s programmatic and business/administrative contact.
4. Project title, proposed start date, and proposed end date.
5. Applicant certification.
1.2. Applicant’s Information & Qualifications
Please fill out this section in the Grantee Portal. Provide in the relevant fields the following information:
1. Lead applicant’s name, type, and contact person (name, title, phone, email and address).
2. A brief description of the applicant’s background and any relevant experience, including with similar projects and/or working with other federal and state awards.
Note: Indicate if the applicant has been debarred or is a suspended entity.
3. Describe each entity involved in the proposed project and provide name and contact information for each entity’s project lead. Identify each entity within the “eligible entity” category as defined in this NOFO. Indicate if any entity falls into the following categories: small utility, municipal utility, electric cooperative, investor-owned utility, entity located in or serving EIEC, Eligible Person, Equity Eligible Contractor.
Note: Indicate the number of MWh of electricity sold and number of customers served annually by each Eligible Entity that serves electric customers.
Note: For each Small Utility, please describe why the entity qualifies as such.
Note: For each entity that falls into “Other relevant entity” category, please describe why it is critical for the Secretary of Energy to approve this entity as an eligible recipient.
1.3. Project Narrative
Upload through the Grantee Portal a Project Narrative, in Microsoft Word or a readable PDF format, of up to 5 pages, in 11- or 12-point font. The Project Narrative must describe the proposed project in sufficient detail, providing the following information:
1. Project Executive Summary.
a. Please provide a summary of the proposed project in 1-2 sentences:
a. Describe your project objectives, activities, and outcomes, indicating how your project fits within the objectives and prioritization described in this NOFO and how many customers will benefit from the project.
b. Explain why the proposed activities require federal funding and why they are not funded without federal assistance.
c. Indicate if the same project is also submitted under the IIJA Section 40101(c), FOA 2740 (GRIP) and if so, describe the differences between your 40101(d) and 40101(c) applications.
2. Project Location: Indicate the location of the project, including whether it is in the EIEC communities and how your project fits withing the project prioritization described in this NOFO. Applicants are encouraged to share maps, spreadsheets, or other detailed data to support their narrative.
a. Indicate the number of customers benefitting from this project and how many customers are in EIECs. Indicate EIEC tracks numbers.
b. Indicate critical facilities benefiting from this project.
3. Activities: Provide detailed description of activities and their intended timelines.
a. Provide qualitative and quantitative description of project’s intended deliverables (e.g. number/miles of infrastructure improvements of ROW clearing, intended number/percent in outage reduction, % or # for SAIDI, SAIFI, CELID, CEMI improvements).
b. Indicate which communities will benefit from the project activities and provide an overview of any anticipated quantifiable results, including anticipated reductions in duration and frequency of outages and number of customers benefiting from these reductions, and their census tract.
4. Anticipated Benefits and Equity. Describe anticipated benefits that will be provided by the project and how.
a. Provide an overview of whether and how the project can reach historically underserved populations, racial minorities, and women, that create the connectivity and conditions for growth where they may not exist, such as in rural and underserved communities.
b. Indicate if the proposed project includes a component for the customers’ outreach and training, diverse contractor engagement and diverse workforce development.
5. Funding Objectives: Describe how the proposed project meets the Program Objectives outlined in this NOFO, and the applicant’s ability to demonstrate compliance with the highlighted metrics as well as demonstrate benefits to the EIEC.
6. Workforce and Labor Standards: Describe proposed strategy to ensure strong labor standards and protections in your project implementation and how the project will drive the creation of good-paying and safe jobs. Indicate if the proposed project includes a component for the training, recruitment, retention, and reskilling of skilled and properly credentialled workers and provide details.
1.4. Attachment A - Metrics, Milestones and Timelines
Please fill out Attachment A Excel spreadsheet for your Metrics, Milestones and Timelines in the corresponding tabs. Attachment A is available through the Grantee Portal and IFA/CB IL40101d website. Upload your completed Attachment A in Grantee Portal. Please note that you will be required to report annual metrics for two calendar years after project conclusion.
1.5. Budget and Budget Justification Spreadsheet
Please fill out the Budget section in the Grantee Portal and fill out and upload the Budget Justification Excel spreadsheet form with your costs estimates, based on the vendor quotes and other best information available. The Budget Justification spreadsheet is available at the IFA/CB 4010d website. Upload your completed Budget Justification in the Grantee Portal. Please base your estimates on the vendor quotes where available. All costs must be allowable, allocatable, and reasonable in accordance with the applicable federal cost principles.
1.6. Vendor Quotes
Please upload vendor quotes for your budget estimates through the Grantee Portal.
1.7. Cost Commitment Letter
Please fill out Cost Commitment Letter and sign it. The Cost Commitment Letter form is available through the Grantee Portal and IFA/CB 4010d website. Upload your signed completed Cost Commitment Letter through the Grantee Portal.
1.8. Environmental Questionnaire (NEPA)
Please fill out Environmental Questionnaire (NEPA) and sign it. The Questionnaire form is available through the Grantee Portal and IFA/CB IL40101d website. Upload your signed completed Questionnaire through the Grantee Portal. Please attach the maps of the project area as requires in the Questionnaire in PDF or JPEG format.
1.9. Certifications of Funding Requirements Compliance.
Please fill out this section in the Grantee Portal. In responding to this NOFO, applicants must acknowledge compliance with the requirements related to this US DOE subaward by certifying in the Grantee Portal compliance with the following:
(1) No Debarment: Certify that you are not suspended, debarred, or otherwise excluded from receiving Federal funds as specified in 2 CFR 200.332 and 2 CFR 180.300 and are not suspended, debarred, or otherwise excluded from receiving Federal funds in SAM.gov and in SAM.gov Exclusions.
(2) Workforce and Labor Standards. Certify that the project will use strong labor standards and protections and drive creation of good-paying and safe jobs.
(3) Davis-Bacon Act compliance. Certify that the project will comply with the requirements of the Davis-Bacon Act and will pay all of the laborers and mechanics performing construction, alteration, or repair work in excess of $2,000 on projects funded directly by or assisted in whole or in part by and through funding under the award, wages at rates not less than those prevailing on projects of a character similar in the locality as determined by subchapter IV of Chapter 1 of Title 40, United State Code commonly referred to as the “Davis-Bacon Act.”
(4) Cybersecurity. Certify that the primary purpose of the proposed project is not cybersecurity but that the implementation of the proposed project will adhere to any applicable cybersecurity requirements, and where possible, best practices in deploying technologies under the subaward.
(5) Build America, Buy America Act (BABA) compliance. Certify that the project will comply with the Build America, Buy America (BABA) Act Requirements. BABA established a domestic content procurement preference requirement to Federally funded public “infrastructure projects.” The BABA requirement applies to articles, materials, and supplies purchased under financial assistance awards (including cost match) for infrastructure projects that are consumed in, incorporated into, or permanently affixed to an infrastructure project that falls into three separate product categories: (i) iron or steel products; (ii) manufactured products; and (iii) construction materials.
(6) No Foreign Work and Materials. Certify that no individuals participating in the project are participating in a Foreign Government-Sponsored Talent Recruitment Program of a Foreign Country of Risk as defined in the ALRD and that all work performed for the project will be performed in the United States and no foreign travel will be involved. Certify that all iron, steel, and manufactured products used in the infrastructure work are produced in the United States and all construction materials used in the infrastructure work are manufactured in the United States. Indicate if a waiver can be requested as specified in Appendix B and C of the ALRD.
(7) Telecommunications and Surveillance. Certify that the requested funding will not be used to procure or obtain equipment, services, or systems that use covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system as defined in the ALRD.
(8) Other Ineligible Activities. Certify that the requested funding will not be used to encourage or support political activities such as the collection and dissemination of information related to potential, planned, or pending legislation or directly or indirectly support or oppose union organizing.
(9) National Environmental Policy Act (NEPA) Compliance. Certify that the project will comply with all applicable NEPA requirements (a successful applicant will be required to file an Environmental Questionnaire identifying locations of the project works and describing the activities anticipated at those locations and any potential environmental impacts).