Opportunity Information
Funding Information
Award Information
Submission Information
Eligibility Information
Additional Information
Award Administration Information
Criteria
All Section 319(h) applications shall be reviewed for completeness, technical merit, cost effectiveness, and adherence to the Clean Water Act, U.S. EPA Section 319(h) program guidance, and the competitive grant evaluation criteria described in this NOFO. Applications found to be complete shall undergo a comprehensive, merit-based review performed in compliance with GATA Legislation, 30 ILCS 708 and Uniform Administrative Requirements, 2 C.F.R. § 200. The merit-based review is designed to evaluate the applications against the following criteria:
For BMP implementation applications, the following criteria will be used
Project Need (0 – 30 points)
The BMPs in the specified location(s) will result in reducing or preventing pollutant loads and/or problems resulting from nonpoint source pollution.
- 100% of the BMP(s) in their locations will reduce or prevent pollutant loads and/or problems resulting from nonpoint source pollution (5 points).
- The BMP type(s) proposed does not have a specific location(s) but will reduce or prevent pollutant loads and/or problems resulting from nonpoint source pollution in the identified watershed (3 points).
- The BMP(s) in the specified locations will not reduce or prevent pollutant loads and/or problems resulting from nonpoint source pollution (0 points).
The pollutant load reduction model results been included in the application.
- The application includes full pollutant load reduction model input and model results in a pdf or spreadsheet format from an approved pollutant load reduction model (Pollutant Load Estimation Tool (PLET), STEP-L, or Region 5 model) (5 points).
- The application includes pollutant load reduction model results from PLET, STEP-L, or Region 5 models in the Additional Details spreadsheet. (3 points)
- The application does not include information on pollutant load reductions (0 points).
The proposed project(s) are recommended in an approved watershed-based plan.
- The specific project or BMP type is recommended in an Illinois EPA approved watershed-based plan that is 10 years old or less (including in plans submitted and currently under Illinois EPA review) (5 points)
- The specific project or BMP type is recommended in an Illinois EPA approved watershed-based plan that is Illinois EPA approved watershed plan or watershed-based plan that is 11 years or older (3 points).
- The specific project or BMP type is not recommended in an Illinois EPA approved watershed-based plan (0 points).
Pounds of phosphorus BMPs will reduce or prevent per year on average.
- Reductions over 249 pounds of phosphorus(5 points)
- Reductions from 150 to 249 pounds of phosphorus (4 points)
- Reductions from 75 to 149 pounds of phosphorus (3 points)
- Reductions from 25 to 74 pounds of phosphorus (2 points)
- Reductions from 1 to 24 pounds of phosphorus (1 Point)
- No reduction (0 points)
Pounds of nitrogen BMPs will reduce or prevent per year on average.
- Reductions over 750 pounds of nitrogen (5 points)
- Reductions from 400 to 749 pounds of nitrogen (4 points)
- Reductions from 200 to 399 pounds of nitrogen (3 points)
- Reductions from 100 to 199 pounds of nitrogen (2 points)
- Reductions from 1 to 99 pounds of nitrogen (1 point)
- No reduction (0 points)
Tons of sediment BMPs will reduce or prevent per year on average.
- Reductions over 300 tons of sediment (5 points)
- Reductions from 150 to 299 tons of sediment (4 points)
- Reductions from 75 to 149 tons of sediment (3 points)
- Reductions from 25 to 74 tons of sediment (2 points)
- Reductions from 1 to 24 tons of sediment (1 point)
- No reduction (0 points)
Project Readiness (0 – 20 points)
BMP(s) types and location identification
- All sites and BMP(s) identified (5 points).
- BMP types are identified, but specific locations have not been identified (3 points)
- No sites or BMP types have been identified (0 point).
Site landowners have confirmed permission to implement the project
- BMP(s) owned 100% by applicant or have a legally binding agreements already in place (5 points).
- BMP(s) with multiple landowners that submitted written confirmation from ALL landowners that they plan to participate (3 points).
- BMP(s) that have some but not all landowner confirmation (2 points).
- BMP(s) without documentation of landowner participation (0 points).
BMP(s) design(s) readiness
- BMP(s) design with PE stamped designs 100% complete (5 points).
- BMP(s)with 60 – 90% designs complete (3 points).
- BMP(s) with only a conceptual design(s) (2 points).
- BMP(s) with only narrative of the proposed project(s) (1 points).
Local, State, and Federal permits
- All required permits secured or no permits required (5 points).
- Some, but not all required permits secured (4 points).
- Permits applied for or all permits that will be needed are described (3 points).
- No discussion of permits (0 points).
Cost-effectiveness (0 – 20 points)
Average BMP cost/unit for the proposed project (if project includes BMPs that use different units, the higher of the 2 scores will be used)
- Cost from $0 - $75 per linear foot or $0 - $20,000 per acre (5 points)
- Cost from $76 - $150 per linear foot or $20,001 - $70,000 per acre (4 point)
- Cost from $151 - $250 per linear foot or $70,001 - $100,000 per acre (3 points)
- Cost from $251 - $600 per linear foot or $100,001 - 150,000 per acre (2 points)
- Cost over $600 per linear foot or over $150,000 per acre (1 point)
Project’s cost per pounds of Phosphorus reduced per year on average.
- Cost of $0-1,000 per pound of phosphorus reduced (5 points)
- Cost of $1,001-3,000 per pound of phosphorus reduced (4 points)
- Cost of $3,001-6,000 per pound of phosphorus reduced (3 points)
- Cost of $6,001-10,000 per pound of phosphorus reduced (2 points)
- Cost over $10,000 per pound of phosphorus reduced (1 points)
Project’s cost of pounds of Nitrogen reduced per year on average.
- Cost of $0-500 per pound of nitrogen reduced (5 points)
- Cost of $501-1,500 per pound of nitrogen reduced (4 points)
- Cost of $1,501-3,000 per pound of nitrogen reduced (3 points)
- Cost of $3,001-5,000 per pound of nitrogen reduced (2 points)
- Cost over $5,000 per pound of nitrogen reduced (1 points)
Project’s cost per ton of Sediment reduced per year on average.
- Cost of $0-1,000 per ton of sediment reduced (5 points)
- Cost of $1,001-3,000 per ton of sediment reduced (4 points)
- Cost of $3,001-6,000 per ton of sediment reduced (3 points)
- Cost of $6,000-10,000 per ton of sediment reduced (2 points)
- Cost over $10,000 per ton of sediment reduced (1 points)
Sustainability (0 – 10 points)
BMPs designed lifespan(s)
- Projects that include 100% of BMPs with lifespan greater than 25 years (5 points).
- Projects that include BMPs with lifespan between 10 and 25 years (4 points).
- Projects that do not exceed the required 10-years of O&M (0 points)
Description of relevant and robust operation and maintenance (O&M) plan, including funds to implement said plan and identification of the entity responsible to implement the O&M plan
- Application specifically outlines the O&M activities necessary for the proposed BMP, source of funding, and responsible entity that has a secured capacity to conduct the required work (5 points).
- Applications provide brief description of required O&M activities, source of funds, and responsible entity (3 points).
- Applications provide no information on O&M activities (0 points).
Nonpoint Source Pollution Activity Coordination (0 – 10 points)
Application continues implementation of other nonpoint source pollution control activities such as BMP construction and/or watershed-based plan implementation
- Applications that document that the project is part of a larger layered effort (ordinances, planning, BMP implementation) to reduce pollutant loads (5 points).
- Applications that link the project only to other individual BMP implementation (3 points).
- Applications that document the project as the only work happening within their jurisdiction (1 point).
Relationship to Illinois EPA Priority Watersheds for Fiscal Year 25
- Applications in or directly impacting a Priority Watershed area (5 points).
- Applications that have no relationship to and are not located within a Priority Watershed (0 points).
For Education and Outreach projects, the following criteria will be used:
Project Need (0 – 30 points)
The Outreach and Information or technical assistance project is for a documented issue in the project area.
- The project directly addresses documented nonpoint source pollution issue(s) in the project area (10 points).
- The project is a preventative effort for an issue that is appropriate for the project area (5 points).
- The project is not address documented nonpoint source pollution issue(s) for the project area (0 points).
The Outreach and Information or technical assistance project is a component of an existing Illinois EPA Watershed-Based Plan or Total Maximum Daily Load (TMDL) Implementation Plan.
- The project directly addresses a critical area(s) identified in an Illinois EPA Watershed-Based Plan or Total Maximum Daily Load (TMDL) Implementation Plan (10 points).
- The project directly addresses a non-critical area(s) identified in an Illinois EPA Watershed-Based Plan or Total Maximum Daily Load (TMDL) Implementation Plan (5 points).
- The project is not based on an Illinois EPA Watershed-Based Plan or Total Maximum Daily Load (TMDL) Implementation Plan (0 points)
The applicant documented that they have engaged key stakeholders in participating in the project
- Key stakeholders have documented a willingness to participate in the project (10 points)
- Key stakeholders have been identified, but have not documented their participation in the project (5 points)
- No stakeholders have been identified as participating in the project (0 points).
Project Readiness (0 – 30 points)
The application promotes point and/or nonpoint source pollution control to watershed stakeholders.
- The application promotes documented point and/or nonpoint source pollution control that is relevant to the project watershed (5 points).
- The application does not promote documented point and/or nonpoint source pollution control (0 point).
The application adequately defines the project’s Goals and Objectives - what the applicant is looking to achieve by engaging the community
- The project clearly defines goals and objectives (5 points).
- The project defines goals and objectives but is not clear (2 points).
- The project does not define goals and objectives (0 point).
The project message or technical assistance is applicable to the NOFO.
- The application has a clear message or technical assistance applicable to the NOFO (5 points).
- The application has a message or technical assistance that is partially applicable to the NOFO (3 points).
- The application has no project message or technical assistance or the message or technical assistance is not applicable (0 point)
The application identifies qualified and appropriate organization(s) to perform outreach and information and/or technical assistance activities.
- The project has qualified and appropriate organization(s) and staff (5 points).
- The project has organization(s) that are qualified and appropriate, but do not have specific staff identified (3 points).
- The project does not have qualified and appropriate organization(s) and staff (0 point).
The application identifies target audience(s)/stakeholders
- The project identifies specific target audience(s) (5 points).
- The project identifies the types of local groups, stakeholders, and experts who are the target audience(s) (3 points).
- The project does not identify the types of local groups, stakeholders, and experts who would be involved and their roles in the process (0 point).
The application identifies delivery mechanisms - the actions that will be taken to engage the target audiences, i.e., meetings, brochures, website, signs, programmatic experiences, educational outreach or technical assistance with partner organizations, tours and/or planting days, displays, newspaper and newsletter articles, etc.
- The application identifies specific delivery mechanisms (5 points)
- The application identifies partial or generic delivery mechanisms (3 points).
- The application does not identify delivery mechanisms (0 points).
Nonpoint Source Pollution Activity Coordination (0 – 10 points)
The project continues implementation of other nonpoint source pollution control activities such as BMP construction and/or watershed-based plan implementation
- The project, when completed, will become part of a continuing education and outreach or technical assistance effort after the grant ends (5 points)
- The project, when completed, will no longer have additional activities (2 points)
Relationship to Illinois EPA Priority Watersheds for Fiscal Year 25
- Applications in or directly impacting a Priority Watershed area (5 points).
- Applications that have no relationship to and are not located within a Priority Watershed (0 points).
For monitoring projects, the following criteria will be used:
Project Need (0 – 30 points)
The monitoring project is for a documented nonpoint source pollution issue in the project area.
- The project directly addresses a documented issue in the project area (10 points).
- The project is a preventative effort for an issue that is appropriate for the project area (5 points).
- The project does not address a relevant nonpoint source pollution for the project area (0 points).
The monitoring project is a component of an existing Illinois EPA Watershed-Based Plan or Total Maximum Daily Load (TMDL) Implementation Plan.
- The project directly addresses a critical area(s) identified in an Illinois EPA Watershed-Based Plan or Total Maximum Daily Load (TMDL) Implementation Plan (10 points).
- The project directly addresses a non-critical area(s) identified in an Illinois EPA Watershed-Based Plan or Total Maximum Daily Load (TMDL) Implementation Plan (5 points).
- The project is not based on an Illinois EPA Watershed-Based Plan or Total Maximum Daily Load (TMDL) Implementation Plan (2 points)
The monitoring activity is not being done by other entities
- The monitoring is not being performed by other entities and is documented as a need in the identified waterbodies (10 points)
- The monitoring is being done by other entities, but not at a needed frequency documented in a watershed plan. (5 points)
- The monitoring is being performed regularly by other entities (0 points)
Project Readiness (0 – 30 points)
The application includes monitoring for point and/or nonpoint source pollution.
- The application includes monitoring of point and/or nonpoint source pollution that is relevant to the project watershed (6 points).
- The application does not include sufficient monitoring for point and/or nonpoint source pollution (0 points).
The status of the project’s Quality Assurance Project Plan (QAPP).
- Applicant has an Illinois EPA approved QAPP (6 points).
- Applicant has submitted a draft QAPP to Illinois IEPA for review (4 points).
- Applicant does not have a QAPP submitted to Illinois EPA for review (0 points and project is ineligible for scoring).
The application identifies qualified and appropriate organization(s) to lead and/or conduct monitoring activities.
- The application has qualified and appropriate organization(s) and staff (6 points).
- The application has organization(s) that are qualified and appropriate, but do not have specific staff identified (4 points).
- The application does not have qualified and appropriate organization(s) and staff (0 points).
The application identifies a specific delivery mechanism for quality data based on lab accreditation.
- The application identifies specific delivery mechanisms (6 points).
- The application identifies partial or generic delivery mechanisms (3 points).
- The application does not identify delivery mechanisms (0 points)
Environmental monitoring is included in the organization’s state charter.
- The application has monitoring in its state charter (6 points).
- The application does not include monitoring in the organization’s state charter (0 points and project is ineligible for scoring).
Sustainability (0 – 10 points)
Project Sustainability
- The project, when completed, will become part of a continuing monitoring effort after the grant ends (10 points)
- The project, when completed, will no longer have additional activities (5 points)
Nonpoint Source Pollution Activity Coordination (0 – 10 points)
The project continues implementation of other nonpoint source pollution control activities such as BMP construction and/or watershed-based plan implementation.
- Applications that document that the project is part of a larger layered effort (ordinances, planning, BMP implementation) to reduce pollutant loads (5 points).
- Applications that link the project only to other project implementation (3 points).
- Applications that document the project as the only work happening within their jurisdiction (2 point).
Relationship to Illinois EPA Priority Watersheds for Fiscal Year 25
- Applications in or directly impacting a Priority Watershed area (5 points).
- Applications that have no relationship to and are not located within a Priority Watershed (0 points).
Review and Selection Process
Illinois EPA staff will be responsible for evaluating and scoring applications.
The complete applications shall be reviewed by an Evaluation Panel that is composed of Illinois EPA staff.
Application scores shall be calculated as follows:
- Applications will be ranked based on the sum of the scoring criteria.
- Applications will be ranked highest to lowest based on total project score.
- Applications with the highest scores will be considered for an award.
Additional review and selection processes are provided below.
- If the amount of available grant funding is not sufficient to fund a higher-ranked application in its entirety, the Illinois EPA shall review the application to determine if a discrete portion or phase of the project meeting the mission of this NOFO can be funded. If the Evaluation Panel determines that it cannot fund the application in full or part, the next highest-ranked application will be reviewed for a discrete portion or phase to be funded to meet the mission of the NOFO or the funds may not be awarded and may be made available through a subsequent NOFO.
- If the Illinois EPA determines that an applicant incorrectly calculated or indicated the project cost, match, and/or total funding request based on the applicable cost estimate, required match, or eligible costs, the application shall still be accepted and reviewed. If the applicant is awarded a grant, the Illinois EPA shall contact the applicant and request a decision from the applicant as to whether it will accept the award based on the Illinois EPA’s determination of the project cost, applicant match, and/or total funding requested. If the applicant does not accept the Illinois EPA’s determination, the application shall not be funded.
Based on eligibility and merit criteria, and the Evaluation Panel scoring, the Illinois’ Section 319(h) Nonpoint Source Work Plan (Work Plan Project list) will be prepared and submitted to U.S. EPA for approval. The Project list identifies the selected applications (Projects) proposed for funding by Illinois EPA. with a budget spreadsheet, a short narrative summary of each Project, and a copy of the selected Project applications.
Following a decision of intent to award, the Illinois EPA is required by GATA to conduct a programmatic risk assessment of the applicant. Additional information may be required at that time from the successful applicant. To remain eligible for the award, the applicant must provide the requested information within the time specified by the Illinois EPA. The Programmatic Risk Assessment evaluates the applicant’s ability to successfully carry out the terms of the Section 319(h) Grant Program and assesses four risk categories: 1) quality of management systems and ability to meet the management standards; 2) history of performance; 3) reports and findings from audits performed on prior awards; and 4) the applicant’s ability to effectively implement statutory, regulatory, or other requirements imposed on a Grantee.
Appeal Process
An appeal process is available to applicants and other interested parties; however, appeals are limited to the Illinois EPA evaluation process. Evaluation scores may not be protested. An appeal must be submitted in writing to the following address: Illinois EPA, Attn: Section 319(h) Grant Program, Bureau of Water, Mail Code #15, P.O. Box 19276, Springfield, Illinois 62794-9276 and must be received within 14 calendar days after the date that the grant award notice has been published by the Illinois EPA on Grants.Illinois.gov. The written appeal shall include at a minimum the following: the name and address of the appealing party, identification of the grant, and a statement of reasons for the appeal. Illinois EPA shall acknowledge receipt of an appeal within fourteen (14) calendar days from the date the appeal was received.
When an appeal is received, the execution of the grant in contention that Illinois EPA intends to make under this NOFO shall be stayed until the appeal is resolved, unless the agency head or designee determines that the needs of the State require that the grant program move forward despite the appeal. This determination, and its rationale, must be documented in writing.
Illinois EPA shall respond to the appeal within 60 days or supply a written explanation to the appealing party as to why additional time is required. The appealing party must supply any additional information requested by Illinois EPA within the time period set in the request. The Director of the Illinois EPA may appoint one or more Appeal Review Officers (ARO) to consider the grant-related appeal and make a recommendation to the Director of the Illinois EPA or designee for resolution. The ARO shall make a recommendation to the Director of the Illinois EPA or designee as expeditiously as possible after receiving all relevant, requested information. In determining the appropriate recommendation, the ARO shall consider the integrity of the competitive grant process and the impact of the recommendation on the Illinois EPA. The Illinois EPA shall resolve the appeal by means of written determination, which shall include, but not be limited to: review of the appeal, appeal determination, and rationale for the determination.
Anticipated Announcement Dates
| Action by Illinois EPA | Target Dates |
| Notify unsuccessful applicants that their application was not selected for inclusion in the Section 319(h) Grant Program Work Plan. | October 30, 2025 |
| Notify applicant of successful grant award. | October 30, 2025 |
| Send a Grant Agreement to the selected applicant for signature. | February 28, 2026 |
| Provide a fully executed Grant Agreement to the grantee. | April 15, 2026 |
The anticipated start date for approved projects is April 15, 2026 or the date of the execution of the contract, whichever comes first.